On this page
A trip budget is one ceiling for the whole party. Treader tracks the trip against it two ways: what your stops are projected to cost, and what your receipts say you have spent. Setting a budget is part of Pro ($4.99 CAD a month). It comes after the stops are down in the trip planning checklist, and splitting trip costs reuses the same receipts. To estimate what a trip will cost before you plan it, the free road trip cost calculator adds fuel, lodging, food and park entry.
Set the ceiling
- 1 Open the Trip hub (Cmd-K and Open trip hub also get you there), choose the Budget tab and press Set a budget.
- 2 Type the total for the whole party in whole units and pick a currency. It starts as the currency in your settings.
- 3 Press Save. Edit reopens it later, and Remove budget clears it.
The Budget tile in the itinerary header opens the same editor, with a day-by-day list under it. Changing the currency later does not convert stop costs, and the editor warns you.
Read the numbers
The tile shows a planned range against your ceiling, with ≈ in front when any of it is estimated. Open the tile for a bar and a tag that give the verdict: Under budget, Close to budget from 85% of the ceiling, and Over budget past it. On a multi-day trip, a day view adds that day's range. A cost you typed counts exactly. A stop without one is estimated from its price range, and a stop with no price data at all is counted as unpriced and adds nothing.
Price a stop
With a budget set, open a stop and press its cost chip: Add cost when it has none, Planned cost when you set one, or the ≈ estimate. Type a whole amount and press Enter. Your number replaces the estimate, so the total firms up as you book, and clearing the field returns the stop to its estimate. Without a budget, stops carry no cost chip.
Log what you actually spent
The Receipts panel on the Budget tab is the other half. Press Add a receipt and fill in the store, receipt number, date, subtotal, tax and total, then a category and, if you split costs, who paid under Paid by. The Trip budget panel then reads spent of your ceiling, and Where it went breaks spending down once receipts span two categories. Planned and spent sit side by side and are never added together. Adding a receipt by hand is part of Pro unless the trip already has a budget or receipts. A receipt you paste in through Paste anything lands in the same list; that is a Scout read, so your plan's monthly Scout allowance applies.
Who sees it and who can change it
- Anyone with edit access can change the ceiling, stop costs and receipts once a trip has a budget, on any plan. Viewers can read and not change.
- Money stays private. A trip's public page never carries the budget, a stop's cost or a receipt.
- Scout is given one line, your ceiling and what is left, and leans toward suggestions that fit.
- A trip priced in another currency than yours gets a second line in yours at the ECB reference rate. Nothing stored changes.
Tip
Under budget only describes the stops Treader can price. Open the Budget tile and check the unpriced count: each of those stops counts as nothing until you give it a cost, so a half-priced plan can look fine.
Common questions
- Can I use a trip budget on the free plan?
- Setting a budget is part of Pro. On a trip that already has one, a Free editor can still change the ceiling, stop costs and receipts, and viewers can read it.
- Does the budget show on a public trip page?
- No. The public page of a trip never includes the budget, any stop cost or any receipt.